All ICAM Factors

This graph shows the number of records within a specific ICAM category.

Click on an element in the graph or in the legend to narrow your choices.

You need to upgrade your Flash Player

LTA = 'Less than adequate'.

ICAM Factors

LTA maintenance 90
LTA Hazard recognition/perception 90
LTA Hazard Identification 77
LTA pressure control 44
LTA work method 42
LTA awareness, competence and behaviour 35
LTA equipment integrity 25
LTA competence/experience/skill for the task 23
Temperature 23
LTA task planning/preparation 20
LTA design, construction, commissioning 20
LTA hazard analysis 17
LTA monitoring, audit and review 13
LTA Inspection 12
LTA operations 12
LTA crisis & emergency management 11
LTA work procedures 11
Congestion/restriction/access 11
LTA equipment / materials handling 10
LTA tools/ equipment / materials (condition/availability/ suitability) 9
Complacency/motivation/attitude 8
LTA Rescue 6
LTA surface gradients/conditions 5
LTA supervision 3
LTA legal requirements, commitments and document control 3
LTA equipment use 2
LTA change management 2
LTA procedural compliance 2
Abnormal. Op. situation/condition 2
LTA Operating speed 2
Chemical 2
LTA suppliers, contractors and partners 1
Wet/ damp tyre 1
LTA lighting 1
LTA communication, consultation and participation 1
LTA condition of equipment 1
Distraction/preoccupation 1
Non-routine task 1
LTA housekeeping 1
LTA operating authority 1
Fatigue 1
LTA routine/ non routine task 1

LTA = 'Less than adequate'.

Printed: 21 January, 2018.

Important Disclaimer

By printing material on this website including all information, text, recommendations, TYREgate graphs, TYREgate Checklists, graphics and images (the "material") you have agreed to the TYREgate Disclaimer. The material may not be applicable for the specific situation at your site and are provided as guidance material only and must be verified using a site specific risk assessment. UQ/MIRMgate does not accept any responsibility for the effectiveness or validity of the recommendations or your reliance on them. The material may not be distributed to other parties without the written permission of The University of Queensland.