All ICAM Categories » LTA design, construction, commissioning

Less than adequate design, construction, commissioning

This graph shows the number of records with the specific Root Contributing Cause.

The graph has been filtered as follows:

  • The ICAM factor is LTA design, construction, commissioning.

Click on an element in the graph or in the legend to view the document list.

You need to upgrade your Flash Player

LTA = 'Less than adequate'.

Root & Contributing Causes

Contact with Powerline 4
Uncontrolled handling of tyre (LTA grip). 2
Confined working environment. 1
Incorrect fasteners used - nuts and studs 1
Incorrect installation of cranage controls. 1
LTA dismantling of 2 piece industrial rim. 1
LTA matching of assembly components. 1
LTA positioning of crane operator. 1
LTA procedure 1
Material fatigue 1
Spillage of fuel onto hot engine. 1
Uncertified lifting equipment 1

LTA = 'Less than adequate'.