CSIRO advises that the information contained in this comprises general statements based on scientific research. The reader is advised and needs to be aware that such information may be incomplete or unable to be used in any specific situation. No reliance or actions must therefore be made on that information without seeking prior expert professional, scientific and technical advice. To the extent permitted by law, CSIRO (including its employees and consultants) excludes all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses and any other compensation, arising directly or indirectly from using this publication (in part or in whole) and any information or material contained in it.



5.4. Stage 3

Stage 3 is characterised by improvement in risk assessment by more systematic application in areas such as design, planning, procedure development and post investigation. Methods of risk assessment might be expanded from basic techniques such as JSA and WRAC to more detailed methods such as Hazard and Operability Studies (HAZOP) for a process design review and Fault Tree Analysis (FTA) or Bow Tie Analysis (BTA) for in-depth consideration of specific site issues.

At Stage 3; the focus may still be on the investigation based on actual outcome but in this stage the need to examine near-hits more extensively should begin to appear.

The site should have established expectations for inspecting, monitoring and auditing that exceed regulatory compliance. These three activities should start to be systematically linked to plans.


APPgate Quick Search


APPgate Partners

APPgate is a collaborative effort of many of the coal producing nations of the Asia Pacific Region:


Australia


Canada


China


India


Japan


Republic of Korea


USA

 


©2018 APPgate