Report: APP CMHS Project 4




CSIRO advises that the information contained in this comprises general statements based on scientific research. The reader is advised and needs to be aware that such information may be incomplete or unable to be used in any specific situation. No reliance or actions must therefore be made on that information without seeking prior expert professional, scientific and technical advice. To the extent permitted by law, CSIRO (including its employees and consultants) excludes all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses and any other compensation, arising directly or indirectly from using this publication (in part or in whole) and any information or material contained in it.



2.3.3. Risk Analysis

Mining operators must comply with various national mining safety regulations regarding specific hazards, such as gas outburst guidelines, gas drainage guidelines, spontaneous combustion guidelines, etc.

There is government consideration of continuous improvement processes to manage risks, such as the PDCA process – Plan, Do, Check, Action. More recently, the use of the risk matrix and various risk analysis models such as the Bow-tie and fault tree analyses have been used to model and analyse failure processes of engineering, in the case of coal mining, this includes mine operations and engineering operations. One of such mine site is at the Xuandong coal mines, a host site for the Australia-China Coal Mine Safety Demonstration Project (www.simtars.qld.gov.au).


APPgate Quick Search


APPgate Partners

APPgate is a collaborative effort of many of the coal producing nations of the Asia Pacific Region:


Australia


Canada


China


India


Japan


Republic of Korea


USA

 


©2018 APPgate